Darwin Marine Supply Base, NT
Equipment used ABI 14/18 Piling Rig, fitted with ABI MRZV 24VV Vibro hammer
thyssenkrupp Infrastructure provided installation equipment and sheet pile to Teras Australia for the upgrade of their Marine barge terminal located at East Arm Darwin NT.
The project included 387 x sheets of Larssen L720 sheetpile at a length of 10m, for the construction of the 232Lm wall.
Installation was carried out by Advance civil utilising thyssenkrupp Infrastructure’s ABI 14/18 Piling Rig to set and drive the piles, then using a BSP CX110 impact hammer to back drive to the required depth.